PRAXOS ADVISORY GROUP
Practice Area 08

Process Safety Management

OSHA's PSM standard (29 CFR 1910.119) applies to facilities handling highly hazardous chemicals above threshold quantities — and the gap between a compliant program on paper and one that actually prevents a catastrophic release is where most PSM failures originate. Thirty years of field experience means knowing which of the fourteen elements are where facilities actually fall short, and what a defensible program looks like under OSHA scrutiny or in the aftermath of an incident.

Start a Conversation → All Practice Areas
At a Glance
Regulatory basisOSHA 1910.119
Engagement typeProject or retainer
CoverageNationwide
Credentials & PracticeCSP · IH · CSHM
Experience30 years
Initial callNo charge

All fourteen PSM elements — built to withstand an OSHA inspection or a post-incident review.

PSM compliance is element-by-element, and deficiencies in any single element can result in willful citations. Program development and audit support are available for the full standard or for specific elements where gaps have been identified.

01

Process Hazard Analysis (PHA)

Facilitation of HAZOP, What-If, or checklist-based PHAs for covered processes — documented to the standard required by 1910.119(e) and defensible under OSHA review.

02

Process Safety Information (PSI)

Development and organization of the required chemical, technology, and equipment documentation — the foundation every other PSM element depends on.

03

Operating Procedures

Written procedures covering normal operations, startups, shutdowns, emergency operations, and temporary operations — reviewed with the employees who use them.

04

Mechanical Integrity

Inspection and testing programs for pressure vessels, piping, relief systems, emergency shutdown systems, and other critical equipment — documented and tracked.

05

Management of Change (MOC)

A functioning MOC system that actually catches changes before they introduce new hazards — not a form that gets filled out after the fact.

06

Incident Investigation

PSM-compliant investigation procedures with root cause analysis, corrective action tracking, and the documentation required if OSHA comes asking.

Facilities where a process failure is not an OSHA citation — it is a catastrophe.

PSM applies to facilities with covered chemicals above threshold quantities. The standard exists because the consequences of getting it wrong are not recoverable.

Chemical Manufacturers

Facilities producing, storing, or handling listed highly hazardous chemicals above OSHA threshold quantities — where PSM compliance is mandatory and enforcement is active.

Industrial Processors

Operations using covered chemicals as process inputs — refrigeration systems, water treatment, agricultural operations, and industrial manufacturing with anhydrous ammonia, chlorine, or other listed substances.

Facilities Post-Incident

Organizations that have experienced a process safety event and need documented, credentialed PSM program development in place quickly — both for regulatory response and to prevent recurrence.

New Covered Facilities

Operations bringing a new process online that crosses a PSM threshold — where program development needs to be complete before operations begin, not retrofitted afterward.

PSM compliance is not a one-time project. It is an ongoing system.

Initial engagements typically begin with a compliance audit to establish where the gaps are, followed by element-by-element program development and implementation support.

01.

PSM Compliance Audit

A structured review of current programs against all fourteen PSM elements — identifying deficiencies, ranking them by enforcement and incident risk, and establishing a prioritized remediation plan.

02.

Program Development

Element-by-element development of the required programs, procedures, and documentation — written to reflect the actual covered process, not a generic template.

03.

PHA Facilitation

Structured Process Hazard Analysis using the method appropriate to the process complexity — HAZOP for complex continuous processes, What-If for simpler covered operations.

04.

Implementation & Training

On-site support during rollout, operator and maintenance training on new procedures, and verification that the system is functioning as documented before OSHA arrives.

Before the engagement begins.

Questions that typically arise when organizations are assessing their PSM obligations or program gaps.

PSM applicability is determined by whether you have a listed highly hazardous chemical at or above the OSHA threshold quantity in a single process. The threshold quantities vary by chemical. An initial consultation can confirm applicability based on your chemical inventory and process configuration.
A PSM compliance audit reviews each of the fourteen elements against the regulatory requirements and, more importantly, against what is actually happening in the facility. Paper programs that are not reflected in actual operations are a significant enforcement and incident risk.
OSHA PSM inspections are document-intensive — inspectors review PSI packages, PHA documentation, MOC records, mechanical integrity logs, incident investigation reports, and training records. They also conduct employee interviews to verify that documented procedures reflect actual practice. Gaps between paper and practice are where most citations originate.
OSHA's PSM standard and EPA's Risk Management Program (RMP) under 40 CFR Part 68 often apply to the same facilities and share many elements. PSM focuses on worker safety; RMP addresses off-site consequences. Most facilities subject to one are subject to both, and an integrated approach to compliance is more efficient than managing them separately.

Need PSM program development or a compliance audit?

A fifteen-minute call — no charge — to understand your situation and determine whether there is a fit before any commitment is made.

Start a Conversation →